FROM ORIGINATION TO RTB

Powering data centers in Chile, where the demand is

With renewable oversupply and grid congestion in Chile, the scarce resource is no longer generation: it is grid connection, land and permits close to demand. A data center needs all three, plus firm renewable supply. Lader develops them under two models: powered land, selling the ready-to-build development to the buyer’s specification, and powered shell, delivering an energized building where the client installs its own equipment.

View of the Lo Aguirre Data Center campus
Lo Aguirre Data Center campus · Pudahuel, Santiago

Data Center Lo Aguirre

100 MW IT Data Center Campus, with room to keep growing. 500 MW grid connection request at 500 kV admitted for processing at the Lo Aguirre switching substation.

Grid connection
500 MW at 500 kV · Request admitted for processing

Environmental screening underway. Renewable supply option under evaluation.

Adjacent BESS Lo Prado: up to 500 MW, environmental approval obtained.

View of the BESS Lo Prado site
BESS Lo Prado · Pudahuel, Santiago
Español

325 → 1,207 MW

Projected data center demand in Chile, 2025–2030

100 MW IT

Lo Aguirre Data Center Campus

500 MW

500 kV connection · Request admitted for processing · Lo Aguirre switching substation

2028

Energization window

Powered land

Land, high-voltage grid connection and permits, ready to build to the buyer’s specification.

Powered shell

An energized building with substation, backup, water and fiber. The client installs UPS, interior cooling and racks.

What we deliver

  1. 01Controlled land with compatible zoning.
  2. 02500 kV grid connection request admitted for processing under open access.
  3. 03All permits and agreements required to start construction, with all supporting studies.
  4. 04Support in procuring 24/7 renewable supply, with adjacent storage.

Sources: National Electricity Coordinator (CEN), data center demand projection (2025). Reference figures, not audited.